The exterior bodywork on RTW335 is almost complete, apart from the steel window pans whilst both decks are progressing down the floor level with ceiling panels, cove panels, window cappings & lining panels all fitted. The window cappings and lining panels have been dry fitted - the cappings may need adjusting when the new window pans arrive, whilst the lining panels have allowed the seat frames to be test fitted.
On the upper deck, the centre timber boards are now fitted, dark stained as original and this deck requires only the cork flooring and some further leathercloth work to complete.
The original exterior window pans for RTW335 are now all at Bonville Panel Craft near Rochford for fabrication of replacements.
Friday, 13 July 2012
Sunday, 27 May 2012
May update
Apologies for the lack of photos but an update on RTW nonetheless.
Our most skilled coachbuilder, Jim, has been absent from the RTW for several weeks during May due to ill-health of his father in law, so progress has not been as much as expected. Jim has done significant work on the RTW and whilst it would be easy to allocate someone else to the project - it makes sense for him to see the project throuugh to conclusion.
Anyway, the upper deck is complete now down to lining panel level and the next job will be to refit the floor cork tiles and timber centre strip - all of which is in hand. Then Jim will start making his way down the stairs...
Our most skilled coachbuilder, Jim, has been absent from the RTW for several weeks during May due to ill-health of his father in law, so progress has not been as much as expected. Jim has done significant work on the RTW and whilst it would be easy to allocate someone else to the project - it makes sense for him to see the project throuugh to conclusion.
Anyway, the upper deck is complete now down to lining panel level and the next job will be to refit the floor cork tiles and timber centre strip - all of which is in hand. Then Jim will start making his way down the stairs...
Saturday, 28 April 2012
RTW335 sees daylight again
It looks a little like a patchwork quilt I know, but today RTW335 saw daylight once again after residing in a corner of the workshop since work started on its restoration. The reason for the move is to relocate RTW335 to the newly designated workshop area where we can better focus on completing restoration work - indeed, it will be right in front of my office!
In recent weeks, we have been focusing on the interior, finalising the new roof dome and sorting through the preparation of a further multitude of individual parts for refitting to the vehicle. We are still resolving the issue with window pans which will really transform RTW335's appearance but now both this bus and MD60 will sit side-by-side in the finishing area. Wouldn't it be great to launch these two buses together in London?
In recent weeks, we have been focusing on the interior, finalising the new roof dome and sorting through the preparation of a further multitude of individual parts for refitting to the vehicle. We are still resolving the issue with window pans which will really transform RTW335's appearance but now both this bus and MD60 will sit side-by-side in the finishing area. Wouldn't it be great to launch these two buses together in London?
Saturday, 24 March 2012
More visible progress
The last few weeks has seen some very rewarding tasks being achieved on RTW335 and this week has been no exception. The lower deck interior is looking more complete, the under canopy of the cab area is being reassembled whilst the mouldings on the exterior panels are also being refitted. There is still much to do, but step by step, RTW335 is coming back to life.
Sunday, 18 March 2012
Focus on the front
Tuesday, 6 March 2012
Fabricating the front dome
It was some months since we did some head-scratching on what to do with RTW335's front dome. It was badly dented, but copying the domes of other surviving RTWs was not really a practical option - because of the difficulty of mouldings and also imperfections in the domes would get replicated. The answer - attempt to create a new dome from a fibreglass example salvaged from an RML. In this picture, Jim Howard starts the process and is encouraged by the fit! Note the London General fleetname on the dome!
Monday, 5 March 2012
More specialist panels prepared
Whilst work on the exterior of RTW335 has visibly progressed by the fitting of the simple flat sheet panels, further work has been progressing on the more complex panelling ready for refitting. Again, parts of the RTW jigsaw but currently "work in progress" and not particularly photogenic. Below are a selection of panels, all previously stripped of paint but now prepared and treated awaiting their turn for reassembly.