The exterior bodywork on RTW335 is almost complete, apart from the steel window pans whilst both decks are progressing down the floor level with ceiling panels, cove panels, window cappings & lining panels all fitted. The window cappings and lining panels have been dry fitted - the cappings may need adjusting when the new window pans arrive, whilst the lining panels have allowed the seat frames to be test fitted.
On the upper deck, the centre timber boards are now fitted, dark stained as original and this deck requires only the cork flooring and some further leathercloth work to complete.
The original exterior window pans for RTW335 are now all at Bonville Panel Craft near Rochford for fabrication of replacements.